64 result(s) for budapest south pest in Getting around
Budapest's Longest Tram Line Opens
- 9 Jul 2019 9:00 AM
- https://bbj.hu/
- getting around
The extension of Budapest tram line 1 was presented to the public this week. The 1.7-kilometer extension makes the tram line the longest in the city (18.3 km), stretching from Kelenföld Railway Station, crossing the river into Pest and back, to Óbuda, news site magyarnemzet.hu reported.
Updated: Summertime Tram Replacement Along Tramlines 4-6 In Budapest
- 8 Jul 2019 9:20 AM
- getting around
Owing to the track refurbishment works, the operation of tramlines 4-6 are replaced by buses on several sections during the summer school holiday.
Summertime Tram Replacement Started Along Lines 4-6
- 21 Jun 2019 9:01 AM
- getting around
Owing to the track refurbishment works, the operation of tramlines 4-6 are replaced by buses on several sections during the summer school holiday.
Revamped Northern Stretch Of M3 Opened In Budapest
- 1 Apr 2019 6:23 AM
- hungarymatters.hu
- getting around
The revamped northern section of Budapest’s metro line 3 started operation on Saturday.
Northern Half Of Metro Line 3 To Be Closed For Reconstruction
- 3 Nov 2017 8:00 AM
- getting around
Six stations on the northern section of metro line 3 in Budapest are to be closed down on Monday for an approximately year-long reconstruction. The line is being closed down from Lehel tér to the northern terminus Újpest Központ, Mayor István Tarlós said. Tunnel reconstruction on the whole line is to start simultaneously, and is expected to last until late 2020, he said.
Petőfi Bridge Celebrates Its 80th Birthday
- 13 Sep 2017 9:00 AM
- getting around
According to pestbuda.hu, the seventh bridge of Budapest was inaugurated 80 years ago, on the 12th of September, 1937. The bridge connecting South Buda and South Pest was originally called Horthy Miklós Bridge, but it was renamed to Petőfi Bridge after WWII. The construction of the bridge was necessary due to the dynamic development of Budapest.
Closure Of Szabadság Bridge In August Creates Traffic Changes
- 6 Aug 2017 6:46 AM
- getting around
BKK press release: "Budapest's Liberty bridge will be closed to traffic on 12-13 August 2017, enabling pedestrians to take over the bridge."
Traffic Changes During Closure Of Szabadság Bridge In August
- 20 Jul 2017 8:04 AM
- getting around
The Liberty bridge will be closed to traffic on 5-6 and 12-13 August 2017, enabling pedestrians to take over the bridge. During the closure, instead of tramlines 47,48 and 49, passengers will have the services of the tram lines running on longer routes in Buda, of the modern trolleybus line 72 running to Fővám tér in Pest and of metro line M4 and of bus lines 7 and 133E between Pest and Buda at ...
New Bridge To Be Built In Budapest
- 3 Jul 2017 8:10 AM
- getting around
A new bridge will be built over the river Danube in southern Budapest, the Centre of Key Government Investments (KKBK) said on Friday. The bridge, which will have three lanes in each direction, will connect the first section of the M1 and M7 motorways on the Buda side of the city with the Pest side up until Jászberenyi Road through the Danube island of Csepel, KKBK said in a statement.
Budapest's Longest Tram Line Opens
- 9 Jul 2019 9:00 AM
- https://bbj.hu/
- getting around
The extension of Budapest tram line 1 was presented to the public this week. The 1.7-kilometer extension makes the tram line the longest in the city (18.3 km), stretching from Kelenföld Railway Station, crossing the river into Pest and back, to Óbuda, news site magyarnemzet.hu reported.
Updated: Summertime Tram Replacement Along Tramlines 4-6 In Budapest
- 8 Jul 2019 9:20 AM
- getting around
Owing to the track refurbishment works, the operation of tramlines 4-6 are replaced by buses on several sections during the summer school holiday.
Summertime Tram Replacement Started Along Lines 4-6
- 21 Jun 2019 9:01 AM
- getting around
Owing to the track refurbishment works, the operation of tramlines 4-6 are replaced by buses on several sections during the summer school holiday.
Revamped Northern Stretch Of M3 Opened In Budapest
- 1 Apr 2019 6:23 AM
- hungarymatters.hu
- getting around
The revamped northern section of Budapest’s metro line 3 started operation on Saturday.
Northern Half Of Metro Line 3 To Be Closed For Reconstruction
- 3 Nov 2017 8:00 AM
- getting around
Six stations on the northern section of metro line 3 in Budapest are to be closed down on Monday for an approximately year-long reconstruction. The line is being closed down from Lehel tér to the northern terminus Újpest Központ, Mayor István Tarlós said. Tunnel reconstruction on the whole line is to start simultaneously, and is expected to last until late 2020, he said.
Petőfi Bridge Celebrates Its 80th Birthday
- 13 Sep 2017 9:00 AM
- getting around
According to pestbuda.hu, the seventh bridge of Budapest was inaugurated 80 years ago, on the 12th of September, 1937. The bridge connecting South Buda and South Pest was originally called Horthy Miklós Bridge, but it was renamed to Petőfi Bridge after WWII. The construction of the bridge was necessary due to the dynamic development of Budapest.
Closure Of Szabadság Bridge In August Creates Traffic Changes
- 6 Aug 2017 6:46 AM
- getting around
BKK press release: "Budapest's Liberty bridge will be closed to traffic on 12-13 August 2017, enabling pedestrians to take over the bridge."
Traffic Changes During Closure Of Szabadság Bridge In August
- 20 Jul 2017 8:04 AM
- getting around
The Liberty bridge will be closed to traffic on 5-6 and 12-13 August 2017, enabling pedestrians to take over the bridge. During the closure, instead of tramlines 47,48 and 49, passengers will have the services of the tram lines running on longer routes in Buda, of the modern trolleybus line 72 running to Fővám tér in Pest and of metro line M4 and of bus lines 7 and 133E between Pest and Buda at ...
New Bridge To Be Built In Budapest
- 3 Jul 2017 8:10 AM
- getting around
A new bridge will be built over the river Danube in southern Budapest, the Centre of Key Government Investments (KKBK) said on Friday. The bridge, which will have three lanes in each direction, will connect the first section of the M1 and M7 motorways on the Buda side of the city with the Pest side up until Jászberenyi Road through the Danube island of Csepel, KKBK said in a statement.