101 result(s) for tender in Getting around
Budapest Transport Company BKV Electronic Ticket System Flawed
- 5 Aug 2016 9:00 AM
- getting around
The Budapest Transport Centre (BKK) has decided that the electronic ticket system being developed for public transport in the city is unworkable and will have to be overhauled before it has been introduced. Népszabadság says it reported three months ago that the Ft 28 billion electronic ticket system would have to be scrapped.
Just Three Eligible To Bid For Hop-On Hop-Off Concession
- 27 Jul 2016 9:00 AM
- getting around
Conditions in a tender for a 20-year concession for hop-on hop-off sightseeing bus service in Budapest suggest just three bidders can participate, daily Magyar Nemzet said.
MÁV Plans To Integrate HÉV Lines With Own Suburban Railway Network
- 15 Feb 2016 3:00 AM
- getting around
State-owned railway company MÁV could integrate the HÉV suburban railway lines into its own network, daily Magyar Idők said, citing unnamed government sources. The government recently announced that MÁV would take over the HÉV lines from the city of Budapest with retroactive effect from the start of this year.
Budapest Fourth Metro Line Seeks Retailers
- 3 Feb 2016 8:00 AM
- getting around
Budapest city asset manager BFVK will invite bids for the rental of commercial spaces in stations along the fourth metro line, which are currently empty, Népszabadság reports. The BFVK collected Ft 29.2 million in rent in 2014, when the line was opened, rising to Ft 46.8 million in 2015.
HUF 1100 Billion To Be Spent On Hungarian Transport Development
- 6 Jan 2016 8:00 AM
- getting around
“2016 will see the beginning of 1100 billion forints (EUR 3.5bn) of investment in transport throughout Hungary, 670 billion (EUR 2.1bn) of which will already be spent in 2016”, László Tasó announced.
HUF 60bn Billion For Budapest HÉV Upgrade
- 19 Oct 2015 9:00 AM
- getting around
A proposal has been drawn up for upgrading the HÉV suburban rail carriages at a cost of Ft 60 billion, mayor István Tarlós announced on Friday. The upgrade of about 300 carriages could be carried out by the city’s own company, therefore no public procurement tender would be needed. The complete overhaul of the inside of the carriages would cost Ft 30 billion and the renewal of the infrastructure, ...
Commuter Trains From Budapest To Esztergom Resume After Long Delay
- 19 Aug 2015 9:00 AM
- getting around
Passenger transport is set to restart on the refurbished rail track between Esztergom and Budapest on Thursday after a Ft 44.5 billion, three-year project reached completion 18 months behind schedule. Passengers can only board diesel trains as MÁV has still not announced the tender for building out the overhead contact lines required for the modern Flirt multiple units to run.
Budapest’s M3 Metro Line Could Face Shutdown At Any Moment
- 10 Aug 2015 9:00 AM
- getting around
Budapest’s public transport company BKV has disclosed dramatic information on the condition of the capital’s metro line 3, arguing that the line’s renovation cannot be delayed further. According to figures cited in a letter to the municipality’s Public Procurement Arbitration Board, over 4000 errors have occurred on metro trains running on the line since 2011, of which 36 resulted in smoke being ...
Tourist Information @ Sziget Festival Budapest
- 8 Aug 2015 9:09 AM
- getting around
Budapest Festival and Tourism Center (BFTK) is operating a Budapestinfo Point at Sziget for the duration of the festival, the purpose of which is to supply festival-goers with information about the capital’s many tourist and cultural attractions. As official representative of the Budapest Municipality, BFTK assists in developing the positive international image of Budapest through the ...
Budapest Transport Company BKV Electronic Ticket System Flawed
- 5 Aug 2016 9:00 AM
- getting around
The Budapest Transport Centre (BKK) has decided that the electronic ticket system being developed for public transport in the city is unworkable and will have to be overhauled before it has been introduced. Népszabadság says it reported three months ago that the Ft 28 billion electronic ticket system would have to be scrapped.
Just Three Eligible To Bid For Hop-On Hop-Off Concession
- 27 Jul 2016 9:00 AM
- getting around
Conditions in a tender for a 20-year concession for hop-on hop-off sightseeing bus service in Budapest suggest just three bidders can participate, daily Magyar Nemzet said.
MÁV Plans To Integrate HÉV Lines With Own Suburban Railway Network
- 15 Feb 2016 3:00 AM
- getting around
State-owned railway company MÁV could integrate the HÉV suburban railway lines into its own network, daily Magyar Idők said, citing unnamed government sources. The government recently announced that MÁV would take over the HÉV lines from the city of Budapest with retroactive effect from the start of this year.
Budapest Fourth Metro Line Seeks Retailers
- 3 Feb 2016 8:00 AM
- getting around
Budapest city asset manager BFVK will invite bids for the rental of commercial spaces in stations along the fourth metro line, which are currently empty, Népszabadság reports. The BFVK collected Ft 29.2 million in rent in 2014, when the line was opened, rising to Ft 46.8 million in 2015.
HUF 1100 Billion To Be Spent On Hungarian Transport Development
- 6 Jan 2016 8:00 AM
- getting around
“2016 will see the beginning of 1100 billion forints (EUR 3.5bn) of investment in transport throughout Hungary, 670 billion (EUR 2.1bn) of which will already be spent in 2016”, László Tasó announced.
HUF 60bn Billion For Budapest HÉV Upgrade
- 19 Oct 2015 9:00 AM
- getting around
A proposal has been drawn up for upgrading the HÉV suburban rail carriages at a cost of Ft 60 billion, mayor István Tarlós announced on Friday. The upgrade of about 300 carriages could be carried out by the city’s own company, therefore no public procurement tender would be needed. The complete overhaul of the inside of the carriages would cost Ft 30 billion and the renewal of the infrastructure, ...
Commuter Trains From Budapest To Esztergom Resume After Long Delay
- 19 Aug 2015 9:00 AM
- getting around
Passenger transport is set to restart on the refurbished rail track between Esztergom and Budapest on Thursday after a Ft 44.5 billion, three-year project reached completion 18 months behind schedule. Passengers can only board diesel trains as MÁV has still not announced the tender for building out the overhead contact lines required for the modern Flirt multiple units to run.
Budapest’s M3 Metro Line Could Face Shutdown At Any Moment
- 10 Aug 2015 9:00 AM
- getting around
Budapest’s public transport company BKV has disclosed dramatic information on the condition of the capital’s metro line 3, arguing that the line’s renovation cannot be delayed further. According to figures cited in a letter to the municipality’s Public Procurement Arbitration Board, over 4000 errors have occurred on metro trains running on the line since 2011, of which 36 resulted in smoke being ...
Tourist Information @ Sziget Festival Budapest
- 8 Aug 2015 9:09 AM
- getting around
Budapest Festival and Tourism Center (BFTK) is operating a Budapestinfo Point at Sziget for the duration of the festival, the purpose of which is to supply festival-goers with information about the capital’s many tourist and cultural attractions. As official representative of the Budapest Municipality, BFTK assists in developing the positive international image of Budapest through the ...