6 result(s) for connection speed in Getting around
Restrictions On Road To Budapest Airport
- 28 Aug 2019 8:51 AM
- http://hungarytoday.hu/
- getting around
Motorists should expect traffic restrictions near Budapest Liszt Ferenc International Airport from Wednesday, as the construction of a turbo roundabout is about to start, with the road narrowing to one lane in both directions, Budapest Airport told MTI on Monday.
V4 Plans High-Speed Rail Connection
- 6 Sep 2018 7:41 AM
- http://www.hatc.hu
- getting around
Cabinet ministers of the Visegrád Four agreed to develop a feasibility study on connecting the quartet with a high-speed rail network, and plans will be completed within a year, Foreign Minister Péter Szijjártó told the state media in Krynica, Poland, where he participated in an economic forum.
New Railway Schedule In Hungary Brings Favourable Changes For Hundreds Of Thousands
- 16 Dec 2013 8:00 AM
- getting around
The new railway schedule is to take effect from 15 December, 2013, offering the most significant increase in service supply in recent years. It is the completion of the railway modernisation between Budapest and Székesfehérvár that brings about developments affecting the highest number of passengers.
Replacement Buses Will Be In Service On Metro Line M2 In Budapest
- 18 Oct 2013 9:01 AM
- getting around
The last phase of the refurbishment project of metro line M2 is the replacement of the signalling system which has been in operation for more than 40 years. The prerequisite of the installation of the new, computer-controlled and modern equipment was the entering into service of the entire Alstom train fleet.
Tram Track Upgrade On Budapest's Busiest Boulevard, Replacement Bus Service Info.
- 18 Oct 2012 11:30 AM
- getting around
Trams 4 and 6 will be out of service between Blaha Lujza tér M station and Corvin-negyed M station until 0400 AM Monday, 5 November 2012 due to construction. During this period, tram replacement buses will be operating between Blaha Lujza tér and Boráros tér in the daytime and between Széll Kálmán tér and Móricz Zsigmond körtér at night. Additionally, one lane of the road will be reserved for ...
The Highlights Of The Danube-Express Ships In Budapest
- 26 Apr 2012 9:02 AM
- getting around
By Sándor Götz: This ship has been planned for the demands of the 21st century, and has multy-functioning possibility and economical operating character—beside that the shipping has a cost like only some small part of road transportation (1/15)—as well as the comfort, the manoeuvring ability and the travelling speed of that can be competitive with all modern traffic vehicles driving in the heavy ...
Restrictions On Road To Budapest Airport
- 28 Aug 2019 8:51 AM
- http://hungarytoday.hu/
- getting around
Motorists should expect traffic restrictions near Budapest Liszt Ferenc International Airport from Wednesday, as the construction of a turbo roundabout is about to start, with the road narrowing to one lane in both directions, Budapest Airport told MTI on Monday.
V4 Plans High-Speed Rail Connection
- 6 Sep 2018 7:41 AM
- http://www.hatc.hu
- getting around
Cabinet ministers of the Visegrád Four agreed to develop a feasibility study on connecting the quartet with a high-speed rail network, and plans will be completed within a year, Foreign Minister Péter Szijjártó told the state media in Krynica, Poland, where he participated in an economic forum.
New Railway Schedule In Hungary Brings Favourable Changes For Hundreds Of Thousands
- 16 Dec 2013 8:00 AM
- getting around
The new railway schedule is to take effect from 15 December, 2013, offering the most significant increase in service supply in recent years. It is the completion of the railway modernisation between Budapest and Székesfehérvár that brings about developments affecting the highest number of passengers.
Replacement Buses Will Be In Service On Metro Line M2 In Budapest
- 18 Oct 2013 9:01 AM
- getting around
The last phase of the refurbishment project of metro line M2 is the replacement of the signalling system which has been in operation for more than 40 years. The prerequisite of the installation of the new, computer-controlled and modern equipment was the entering into service of the entire Alstom train fleet.
Tram Track Upgrade On Budapest's Busiest Boulevard, Replacement Bus Service Info.
- 18 Oct 2012 11:30 AM
- getting around
Trams 4 and 6 will be out of service between Blaha Lujza tér M station and Corvin-negyed M station until 0400 AM Monday, 5 November 2012 due to construction. During this period, tram replacement buses will be operating between Blaha Lujza tér and Boráros tér in the daytime and between Széll Kálmán tér and Móricz Zsigmond körtér at night. Additionally, one lane of the road will be reserved for ...
The Highlights Of The Danube-Express Ships In Budapest
- 26 Apr 2012 9:02 AM
- getting around
By Sándor Götz: This ship has been planned for the demands of the 21st century, and has multy-functioning possibility and economical operating character—beside that the shipping has a cost like only some small part of road transportation (1/15)—as well as the comfort, the manoeuvring ability and the travelling speed of that can be competitive with all modern traffic vehicles driving in the heavy ...