139 result(s) for m4
The Budapest M4 Metro: A Study In Inefficiency And Waste
- 1 Apr 2014 9:00 AM
- getting around
Originally conceived in 1972 as a means for transporting commuters between Budafok (south-west Budapest) and downtown Pest, the decision to build the Budapest M4 metro was made in May 1991 during the first Demszky administration. Nol.hu writes that the project was started without permits, without the consent of owners, without the necessary management, and without moneymoney. With the exception ...
New Surface Transport Network Following Start Of Metro Line M4 On 29 March 2014
- 28 Mar 2014 8:02 AM
- getting around
According to the announcement by Budapest Mayor István Tarlós passengers will be able to start using metro line M4 from 12:00 noon on Friday, 28 March 2014. The new metro line will be operating until the last scheduled departures on Friday while the surface transport network will remain unchanged: buses will be operating based on their current schedules and routes until the following day; the new ...
New Metro Line In Budapest Opens On Friday, 28 March
- 27 Mar 2014 11:00 AM
- getting around
Budapest’s fourth metro line is planned to be opened to the public at around noon on Friday, March 28. Passengers will be able to ride for free for the first two days. The line will run along ten stops between the Keleti and Kelenföld railway stations.
Viktor Orbán & István Tarlós Will Jointly Hand Over The Metro Line M4 In Budapest On 28th March
- 26 Mar 2014 8:04 AM
- getting around
On 28th March at 9 a.m. the Prime Minister of Hungary and the Mayor of Budapest will hand over the completed Metro Line M4 for passenger service, announced István Tarlós.
EU Money To Fund Motorway Projects In Hungary, Says Lázár
- 24 Mar 2014 8:00 AM
- getting around
Motorways in Hungary until 2020 have to reach the country’s borders, to bring closer ethnic Hungarians living in neighbouring countries, the cabinet chief said on Friday.
All Ten M4 Stations In Budapest Now Have Their Completion Certificates
- 6 Feb 2014 8:00 AM
- getting around
The last station of metro line M4, Kelenföld Railway Station, has received its completion certificate from the National Transport Authority, and so all stations are now ready for the Test in Traffic Operation. Before obtaining the temporary completion certificate for the entire line, the certificates for the stations and the depot had to be had, and the tunnels also have to following the on-going ...
Delivery-Acceptance Procedures Of Budapest Metro Line M4 Station Has Come To An End
- 25 Jan 2014 8:00 AM
- getting around
The Fővám tér station of the new metro line has also received the completion certificate, issued by the National Transport Authority, which was essential in order to start test runs with passengers. This is the ninth station ready to receive passengers. A new subway was built for the station, and a section of the square has been relieved of the traffic between the university and the Danube.
E-PM Asks For European Probe Into Hungary M4 Motorway
- 6 Jan 2014 8:00 AM
- getting around
The opposition E-PM alliance is asking European institutions to probe the costs of a motorway section in eastern Hungary. E-PM co-leader Benedek Jávor told a press conference on Friday that the M4 section between Abony and Fegyvernek had cost a total 110 billion forints (EUR 370m), 3.8 billion per kilometre.
Test Runs Without Passengers Start On Metro Line M4
- 24 Oct 2013 9:00 AM
- getting around
The construction project of metro line M4 has reached its final phase: the period of the so-called White Tests, i.e. test runs on the entire line with the trains without passengers. Until November 2013 Siemens, the manufacturer of the signalling system will carry out continuous testing then from December onwards the future operator, BKV will take over the testing process. Beginning in January ...
The Budapest M4 Metro: A Study In Inefficiency And Waste
- 1 Apr 2014 9:00 AM
- getting around
Originally conceived in 1972 as a means for transporting commuters between Budafok (south-west Budapest) and downtown Pest, the decision to build the Budapest M4 metro was made in May 1991 during the first Demszky administration. Nol.hu writes that the project was started without permits, without the consent of owners, without the necessary management, and without moneymoney. With the exception ...
New Surface Transport Network Following Start Of Metro Line M4 On 29 March 2014
- 28 Mar 2014 8:02 AM
- getting around
According to the announcement by Budapest Mayor István Tarlós passengers will be able to start using metro line M4 from 12:00 noon on Friday, 28 March 2014. The new metro line will be operating until the last scheduled departures on Friday while the surface transport network will remain unchanged: buses will be operating based on their current schedules and routes until the following day; the new ...
New Metro Line In Budapest Opens On Friday, 28 March
- 27 Mar 2014 11:00 AM
- getting around
Budapest’s fourth metro line is planned to be opened to the public at around noon on Friday, March 28. Passengers will be able to ride for free for the first two days. The line will run along ten stops between the Keleti and Kelenföld railway stations.
Viktor Orbán & István Tarlós Will Jointly Hand Over The Metro Line M4 In Budapest On 28th March
- 26 Mar 2014 8:04 AM
- getting around
On 28th March at 9 a.m. the Prime Minister of Hungary and the Mayor of Budapest will hand over the completed Metro Line M4 for passenger service, announced István Tarlós.
EU Money To Fund Motorway Projects In Hungary, Says Lázár
- 24 Mar 2014 8:00 AM
- getting around
Motorways in Hungary until 2020 have to reach the country’s borders, to bring closer ethnic Hungarians living in neighbouring countries, the cabinet chief said on Friday.
All Ten M4 Stations In Budapest Now Have Their Completion Certificates
- 6 Feb 2014 8:00 AM
- getting around
The last station of metro line M4, Kelenföld Railway Station, has received its completion certificate from the National Transport Authority, and so all stations are now ready for the Test in Traffic Operation. Before obtaining the temporary completion certificate for the entire line, the certificates for the stations and the depot had to be had, and the tunnels also have to following the on-going ...
Delivery-Acceptance Procedures Of Budapest Metro Line M4 Station Has Come To An End
- 25 Jan 2014 8:00 AM
- getting around
The Fővám tér station of the new metro line has also received the completion certificate, issued by the National Transport Authority, which was essential in order to start test runs with passengers. This is the ninth station ready to receive passengers. A new subway was built for the station, and a section of the square has been relieved of the traffic between the university and the Danube.
E-PM Asks For European Probe Into Hungary M4 Motorway
- 6 Jan 2014 8:00 AM
- getting around
The opposition E-PM alliance is asking European institutions to probe the costs of a motorway section in eastern Hungary. E-PM co-leader Benedek Jávor told a press conference on Friday that the M4 section between Abony and Fegyvernek had cost a total 110 billion forints (EUR 370m), 3.8 billion per kilometre.
Test Runs Without Passengers Start On Metro Line M4
- 24 Oct 2013 9:00 AM
- getting around
The construction project of metro line M4 has reached its final phase: the period of the so-called White Tests, i.e. test runs on the entire line with the trains without passengers. Until November 2013 Siemens, the manufacturer of the signalling system will carry out continuous testing then from December onwards the future operator, BKV will take over the testing process. Beginning in January ...















