40 result(s) for tram replacement
Metro M2 Will Not Serve Kossuth Tér For 3 Months
- 8 Dec 2016 7:11 AM
- getting around
For a period of about three months from the start of this December, metro line M2 will not serve the Kossuth Lajos tér M in either direction, due to the demolition of the MTESZ building. From Deák Ferenc tér, Kossuth Lajos tér can be reached by replacement bus M2A. Additionally, BKK provides a new shuttle-boat service, line D2 between Batthyány tér and Kossuth Lajos tér.
Metro Line M3 Will Be Replaced By Buses Between Nagyvárad Tér And Kőbánya-Kispest On 6-7 August
- 5 Aug 2016 9:01 AM
- getting around
Due to repair works, metro line M3 will be replaced by buses between Nagyvárad tér and Kőbánya-Kispest on 6-7 August 2016 (Saturday-Sunday). Metro cars will be operating between Újpest-Központ and Nagyvárad tér.
Temporary Service Changes On Tram Lines In Budapest Until End Of August
- 27 Jun 2016 9:01 AM
- getting around
Major refurbishment and modernisations works affecting public transport services will take place in the South Buda area of Budapest expected to last until 28 August 2016.
Cogwheel Railway (Tram Line 60) Is Replaced By Bus In The Beginning Of May
- 5 May 2016 9:00 AM
- getting around
On 5 May (Thursday), 9 May (Monday), 10 May (Tuesday), 11 May (Wednesday) and on 12 May (Thursday) 2016, from 8:30 to the last scheduled departures, the cogwheel railway is out of service due to geotechnical investigation in order that the renovation plans of the retaining walls could be made.
Updated: Renewal Of Széll Kálmán Tér - Changes Valid Until 10 May
- 30 Apr 2016 9:02 AM
- getting around
See below for latest news about traffic flow issues and public transport changes, from BKK Centre for Budapest Transport. The Széll Kálmán tér reconstruction works in Buda began on 12 January 2015, and are set to last for 1.5 years, at least.
More BKK Public Transport Serving Sziget 2015
- 10 Aug 2015 2:35 AM
- getting around
As you know, the Sziget Festival is held on Óbuda Island, this year for the 23rd time from Monday 10 August to Monday 17 August 2015. BKK provides higher frequencies on suburban railway line H5, which runs again on the full length of the route from 9 August and also on tram line 6, operates vehicles with bigger passenger capacity on night lines 901 and 918 and is launching special dedicated ...
Trams 4 & 6 In Budapest Are Running On Shortened Routes For Circa 2 Months
- 30 Mar 2015 9:00 AM
- getting around
Due to the construction works of the interconnected tram network in Buda, the refurbishment of the track section of tram lines 4 and 6 between Aradi utca and Tátra utca on the Grand Boulevard and the warranted repair work of the Margaret bridge, trams 4 and 6 are running on shortened routes during the daytime and are replaced by buses at night on the full length from 21 March 2015 for circa two ...
Public Transport Will Get You To The Festivities In Budapest On 20 August
- 20 Aug 2014 8:00 AM
- getting around
Traffic changes will be made in public transport service and on roads and Danube bridges on the eve and the day of St. Stephen’s Day (Tuesday, 19 August and Wednesday, 20 August 2014). Already on 19 August 2014, traffic restrictions will be in place at several locations in the city due to preparations for the celebrations, therefore some public transport lines will run on modified routes.
Replacement Buses Will Be In Service On Metro Line M2 In Budapest
- 18 Oct 2013 9:01 AM
- getting around
The last phase of the refurbishment project of metro line M2 is the replacement of the signalling system which has been in operation for more than 40 years. The prerequisite of the installation of the new, computer-controlled and modern equipment was the entering into service of the entire Alstom train fleet.
Metro M2 Will Not Serve Kossuth Tér For 3 Months
- 8 Dec 2016 7:11 AM
- getting around
For a period of about three months from the start of this December, metro line M2 will not serve the Kossuth Lajos tér M in either direction, due to the demolition of the MTESZ building. From Deák Ferenc tér, Kossuth Lajos tér can be reached by replacement bus M2A. Additionally, BKK provides a new shuttle-boat service, line D2 between Batthyány tér and Kossuth Lajos tér.
Metro Line M3 Will Be Replaced By Buses Between Nagyvárad Tér And Kőbánya-Kispest On 6-7 August
- 5 Aug 2016 9:01 AM
- getting around
Due to repair works, metro line M3 will be replaced by buses between Nagyvárad tér and Kőbánya-Kispest on 6-7 August 2016 (Saturday-Sunday). Metro cars will be operating between Újpest-Központ and Nagyvárad tér.
Temporary Service Changes On Tram Lines In Budapest Until End Of August
- 27 Jun 2016 9:01 AM
- getting around
Major refurbishment and modernisations works affecting public transport services will take place in the South Buda area of Budapest expected to last until 28 August 2016.
Cogwheel Railway (Tram Line 60) Is Replaced By Bus In The Beginning Of May
- 5 May 2016 9:00 AM
- getting around
On 5 May (Thursday), 9 May (Monday), 10 May (Tuesday), 11 May (Wednesday) and on 12 May (Thursday) 2016, from 8:30 to the last scheduled departures, the cogwheel railway is out of service due to geotechnical investigation in order that the renovation plans of the retaining walls could be made.
Updated: Renewal Of Széll Kálmán Tér - Changes Valid Until 10 May
- 30 Apr 2016 9:02 AM
- getting around
See below for latest news about traffic flow issues and public transport changes, from BKK Centre for Budapest Transport. The Széll Kálmán tér reconstruction works in Buda began on 12 January 2015, and are set to last for 1.5 years, at least.
More BKK Public Transport Serving Sziget 2015
- 10 Aug 2015 2:35 AM
- getting around
As you know, the Sziget Festival is held on Óbuda Island, this year for the 23rd time from Monday 10 August to Monday 17 August 2015. BKK provides higher frequencies on suburban railway line H5, which runs again on the full length of the route from 9 August and also on tram line 6, operates vehicles with bigger passenger capacity on night lines 901 and 918 and is launching special dedicated ...
Trams 4 & 6 In Budapest Are Running On Shortened Routes For Circa 2 Months
- 30 Mar 2015 9:00 AM
- getting around
Due to the construction works of the interconnected tram network in Buda, the refurbishment of the track section of tram lines 4 and 6 between Aradi utca and Tátra utca on the Grand Boulevard and the warranted repair work of the Margaret bridge, trams 4 and 6 are running on shortened routes during the daytime and are replaced by buses at night on the full length from 21 March 2015 for circa two ...
Public Transport Will Get You To The Festivities In Budapest On 20 August
- 20 Aug 2014 8:00 AM
- getting around
Traffic changes will be made in public transport service and on roads and Danube bridges on the eve and the day of St. Stephen’s Day (Tuesday, 19 August and Wednesday, 20 August 2014). Already on 19 August 2014, traffic restrictions will be in place at several locations in the city due to preparations for the celebrations, therefore some public transport lines will run on modified routes.
Replacement Buses Will Be In Service On Metro Line M2 In Budapest
- 18 Oct 2013 9:01 AM
- getting around
The last phase of the refurbishment project of metro line M2 is the replacement of the signalling system which has been in operation for more than 40 years. The prerequisite of the installation of the new, computer-controlled and modern equipment was the entering into service of the entire Alstom train fleet.